Title
Love Through a Prism
Total Episode
15
Love Through a Prism
TV
The dawn of the 20th century, a difficult period for women to realize their dreams. At an art academy in London, Lili, a Japanese art student chasing her dreams, meets Kit, an artistic prodigy from a family of aristocrats. Their meeting, transcending social status and their home countries, will set their fates in motion...!
Media is currently unavailable.
REKOMENDASI
MOVIE
4.9
2025-07-09
Ziam
SERIES
8.4
2022-11-17
Weak Hero
MOVIE
5.3
2012-04-19
Nenek Gayung
SERIES
6
2026-02-04
Tiba tiba brondong
MOVIE
7.9
2024-08-28
Flow
MOVIE
7.2
2025-12-24
Janur Ireng: Sewu Dino the Prequel
SERIES
7.6
2019-07-05
Fire Force
MOVIE
6.4
2026-05-01
Animal Farm
SERIES
7.5
2023-11-24
The Story of Park's Marriage Contract
SERIES
6.7
2026-02-13
Heart Code
SERIES
6.4
2026-02-12
A dan Z: InsyaAllah Cinta [Indonesian]
MOVIE
5.3
2022-05-25